![]() On March 16, work continued on the 251. Here Volunteer Randy Smith begins securing the armored cab to the body by inserting bolts into the flanges. |
![]() As Jim Tucker looks on, Randy begins tightening the bolts. |
![]() Jim takes over securing the cab to the body . . . |
![]() . . . while Randy works on the wiring. |
![]() In this photos Lyle Slaton and Randy Smith work on reattaching the right stowage bin. |
![]() The left bin has been mounted. |
![]() A view of the underside of the stowage bin. |
![]() A look at the inside of the left stowage bin. |