On March 16, work continued on the 251. Here Volunteer Randy Smith begins securing the armored cab to the body by inserting bolts into the flanges.

As Jim Tucker looks on, Randy begins tightening the bolts.

Jim takes over securing the cab to the body . . .

. . . while Randy works on the wiring.

In this photos Lyle Slaton and Randy Smith work on reattaching the right stowage bin.

The left bin has been mounted.

A view of the underside of the stowage bin.

A look at the inside of the left stowage bin.