![]() On February 6, the newly overhauled Maybach HL42TUKRM engine is ready to be installed in the 251 halftrack. |
![]() Volunters Kenneth Johns and Russell Stansbury make adjustments to the clutch assembly. |
![]() Great care is taken to guide the engine into place. |
![]() The engine is slowly lowered onto the frame. |
![]() Almost in place. |
![]() Once the engine has been secured to the mounts, volunteer Jeff Berry begins to remove the hoist chains. |
![]() The process of reattaching cables, wires, hoses and other parts begins. |
![]() Gerald is making adjustments to one of the fan belt pulleys. |